Aegis Logistics runs an integrated LPG and liquid logistics platform spanning sourcing, port terminals, storage and distribution across India, and its Q2 FY 2026-2027 print arrives just as West Asia supply routes partially normalise after months of disruption. The key things the quarter will speak to are whether management's 'normalcy return back' call for Q2 played out in volumes, and whether the elevated INR7,000+ per ton distribution margin held as supply chains stabilise.

Quick Details
Results dateOctober 26, 2026
QuarterQ2 FY 2026-2027
Previous quarter revenueRs. 2,356.86 Cr (Q1 FY27)
Previous quarter PATRs. 484.44 Cr (owners, Q1 FY27)
Market capRs. 47,030.47 Cr
CMPRs. 1,340.0

Aegis Logistics Limited Q2 Results Date and Time

Aegis Logistics is scheduled to report its Q2 FY 2026-2027 results on October 26, 2026.

For FY26, the company paid an interim dividend of 200% (Rs 2.00/share) and a final dividend of 670% (Rs 6.70/share), taking the total FY26 dividend to Rs 8.70 per share on a Rs 1 face value; the final dividend was approved at the 69th AGM.

What to expect from Aegis Logistics Limited's Q2 FY27 results

The central test this quarter is management's Q1 FY27 call statement that 'normalcy return back... sometime in Q2' on LPG supply, after April throughput fell about 50% and May about 30% during the West Asia disruption. The external backdrop supports a sequential recovery — national LPG consumption rose from 2.35 mn tons in July to 2.42 mn tons in August, and the July ceasefire saw Hormuz traffic resume — but October's re-escalation, with Hormuz traffic at about 74% of pre-war levels, suggests normalisation is partial and back-loaded within the quarter. On margins, the bigger question is internal: Q1's 30.28% EBITDA margin was flattered by a Rs 443 Cr inventory drawdown, and the gas division's 26.41% EBIT margin sits well above its 8-16% historical range, so margins are more likely compressing toward historical norms even as the blended distribution margin stays guided at around INR7,000 plus per ton for FY27. Saudi CP re-rising through the quarter (September propane $625/tonne, October $680/tonne) passes through reported revenue, and the rupee's 1.2% July-September decline is a mild tailwind to dollar-denominated sourcing margins of $85-90 per ton. The call is also expected to cover the commissioning cadence — Mumbai's 64,000 cbm in H1 FY27, JNPA Phase-1 liquid storage in Q3 FY27, the Kandla-Gorakhpur pipeline in H1 FY27 — and the first ammonia distribution margin disclosure promised after Pipavav's first quarter of operations.

Key Things To Watch

Performance vs guidance tracking: Management has multiple open guidance items that can be directly checked against this quarter's print.

  • Supply normalisation — 'normalcy return back' guided for Q2 FY27 — directly testable this quarter against Q1's 1.124 mn MT terminal throughput
  • Distribution margin — INR7,000+/ton guided through FY28, blended around INR7,000 plus for FY27 — Q1 FY27 sustained at INR7,000+
  • Gross capex — INR10,000 crores ($1.2 billion) by FY27 — progress vs the INR5,000 crores base with ~INR3,500 crores of projects underway as of Q3 FY26
  • Gas distribution volume — 2 million tons (LPG plus ammonia) by FY28 — Q1 FY27 run-rate at 2.77 lakh MT per quarter
  • Group CAGR — exceed 25% (2022-2027) — FY26 PAT grew 41%; track H1 FY27 pace

Commissioning cadence across terminals

  • Mumbai additional 64,000 cubic meters liquid storage (~INR125 crores) — commissioning targeted H1 FY27, due imminently
  • JNPA Phase-1 liquid storage — Q3 FY27 per the Q1 FY27 call, revised from Q1 FY27 stated at the AGM; the 35,000 MTPA LPG bottling plant was commissioned October 15, 2026
  • Kandla-Gorakhpur LPG pipeline — H1 FY27, after a March-to-June slip on third-party land-compensation issues; a third consecutive slip is the item to monitor
  • First ammonia distribution margin disclosure — promised after the first quarter of operations, with launch stated as 'within weeks to a month' as of August 14, 2026

Margin bridge and QoQ profitability

  • Q1 FY27 revenue fell 9.16% QoQ while PAT (owners) rose 18.05% QoQ — the Q2 seasonality bridge between these lines warrants explanation
  • How much of Q1's 30.28% EBITDA margin was the Rs 443 Cr inventory drawdown versus recurring, and the reported-vs-normalized EBITDA reconciliation given the rupee's Q2 move
  • Gas EBITDA per tonne versus the ~INR1,280 analyst reference point from the Q2 FY26 call

Funding execution and Tristar completion

  • Tristar Holdings acquisition — 89.8% for US$809mn equity consideration, completion expected Q4 FY27 subject to competition/anti-trust approvals; watch the funding plan
  • Rs 6,000 crore fundraising authorisation and EGM outcome (voting result not disclosed in the retrieved filing); any QIP launch within stated guardrails including a discount of no more than 5% to floor price
  • How the $5 billion domestic capex roadmap through FY2030-31 is reconciled with the US$809mn outbound Tristar outlay and the Rs 6,000 crore fundraising envelope

Risks and headwinds to monitor

  • CARE placed the CARE AA (RWD) long-term rating on Rating Watch with Developing Implications on October 21, 2026; CARE A1+ reaffirmed; reason not disclosed — a funding-cost overlay on the Tristar and fundraising path
  • West Asia re-escalation in October — Iran claimed a strike on an LPG tanker and Hormuz traffic fell to about 74% of pre-war levels — against management's supply-diversification stance across Canada, US, Argentina and Nigeria
  • Liquid segment: FY26 EBITDA fell 5% on phasing of capacity additions; watch whether newly commissioned Mumbai/JNPA capacity begins reversing this and whether the 77% Q3 FY26 liquid margin is sustained

Frequently Asked Questions

Is Aegis Logistics' INR7,000+ per ton LPG distribution margin sustainable?

Management has guided a blended distribution margin of around INR7,000 plus per ton for FY27 and INR7,000+ per ton through FY28, tying sustainability to continued volume growth. The margin has stepped up from about INR4,000 per ton achieved up to FY24-25, helped by Mangalore terminal operationalisation and capacity increases at Kandla and Pipavav.

Can Aegis Logistics sustain its 25% CAGR guidance?

The CFO has said 'We would exceed the 25% CAGR... from 2022 to 2027', calling the target conservative, with base EPS having grown from INR6 to INR26 and FY26 PAT up 41%. The guidance is open-ended, with potential step-up growth from enablers being put in place.

What margins does Aegis Logistics earn from its ammonia business?

Management has confirmed ammonia throughput margins of INR2,500-3,000 per ton and distribution margins of up to INR5,000 per ton. Ammonia distribution will be run inside the existing Aegis distribution business, with margin details promised after the first quarter of operations at Pipavav.

Is Aegis Logistics on track with its capex guidance?

The company has guided gross capex of INR10,000 crores ($1.2 billion) by FY27, against an INR5,000 crores position with about INR3,500 crores of projects underway as of Q3 FY26. A longer-term pipeline of approximately $5 billion through FY2030-31 is also in place, with heavy investment phases in FY29, FY30 and FY31.

Is Aegis Logistics' revenue growing?

Q1 FY27 revenue rose 37.07% YoY to Rs. 2,356.86 Cr, driven by LPG distribution volumes that grew 91% YoY to 2.77 lakh MT, though revenue declined 9.16% QoQ. Terminal logistics volumes held resilient at 1.124 million MT despite geopolitical disruptions.